- What Attracts GST in Real Estate — and What Does Not
- Key Definitions: Promoter, Affordable Housing, Completion Certificate
- GST on Under-Construction Residential Properties — Current Rates
- GST on Commercial Under-Construction Properties
- Joint Development Agreements (JDA) — The Most Complex GST Area
- Works Contract in Real Estate — GST for Contractors
- RCM in Construction — The 80% Registered Supplier Rule
- ITC in Real Estate — What Builders Can and Cannot Claim
- Affordable Housing — PMAY, EWS/LIG, and GST Exemptions
- Redevelopment Projects and Society Reconstruction
- GST on Long-Term Lease of Land and Land Sale
- GST on Ancillary Property Charges
- Impact of 56th GST Council Rate Rationalization on Construction
- Compliance for Real Estate Developers — Key Requirements
- Common Issues, Disputes & GST Notices in Real Estate
- Case Studies
- Frequently Asked Questions
1. What Attracts GST in Real Estate — and What Does Not
| Transaction | GST Applicable? | Legal Basis |
|---|---|---|
| Sale of under-construction flat/apartment to buyer | ✅ Yes | Schedule II Entry 5(b) — deemed supply of service |
| Sale of completed / ready-to-move flat (OC received before sale) | ❌ No GST | Para 5, Schedule II — completed building excluded |
| Sale of land | ❌ No GST | Schedule III Entry 5 — not a supply |
| Resale of flat by individual to another individual | ❌ No GST | Not a business activity; not supply under GST |
| Works contract services by contractor to developer | ✅ Yes — 18% | NN 11/2017-CT(R); post-Sept 2025 rate |
| Transfer of Development Rights (TDR) by landowner | ✅ Yes (RCM) | NN 13/2017-CT(R), Entry 5C; developer pays RCM |
| Long-term lease of land (≥30 years) to developer | ✅ Yes (RCM) | NN 13/2017-CT(R); developer pays 18% RCM |
| Renting of completed commercial property | ✅ Yes — 18% | Taxable service; ITC available to tenant (registered) |
| Renting of residential property for residential use | ❌ Exempt | NN 12/2017-CT(R) — residential let out for residential use |
| Pure labour contract for PMAY (EWS/LIG housing) | ❌ Exempt | NN 12/2017-CT(R) Entry 10 |
GST is charged ONLY on under-construction properties. The moment a builder obtains an Occupancy Certificate (OC) / Completion Certificate (CC) from the local authority, the property is legally “complete” — and any sale after that point is not subject to GST. Buyers who purchase ready-to-move flats with CC/OC in hand pay zero GST — only stamp duty and registration charges apply.
2. Key Definitions
Promoter / Developer § 2(zk), RERA Act / GST Notifications
A person who constructs or develops a real estate project for sale to buyers. Under GST, the promoter is the registered taxable person responsible for charging and depositing GST on sales of under-construction units.
Affordable Housing NN 03/2019-CT(R) and NN 04/2019-CT(R)
A residential unit qualifies as “affordable housing” for the 1% GST rate ONLY if BOTH conditions are met:
| City Type | Carpet Area Condition | Value Condition |
|---|---|---|
| Metropolitan cities (Bengaluru, Chennai, Delhi NCR, Hyderabad, Kolkata, Mumbai MMR, Pune, Ahmedabad) | Carpet area ≤ 60 sq. metres | Value (total consideration) ≤ ₹45 lakh |
| Non-metropolitan cities (all other cities/towns) | Carpet area ≤ 90 sq. metres |
Completion Certificate / Occupancy Certificate
A document issued by the local authority (municipal corporation, development authority) certifying that construction is complete and compliant with approved plans. Once issued, the property is legally “complete” — not under construction. This certificate is the GST trigger point: sales before OC = taxable; sales after OC = not taxable.
Carpet Area vs Super Built-Up Area
GST notifications use carpet area (net usable floor area, excluding walls) for the affordable housing definition — not super built-up area or built-up area. A flat with 70 sqm super built-up area may well have ≤60 sqm carpet area and qualify as affordable.
3. GST on Under-Construction Residential Properties — Current Rates
3.1 Affordable Housing — 1% Without ITC NN 03/2019-CT(R)
Under-construction residential units meeting the affordable housing criteria are taxed at 1% GST (0.5% CGST + 0.5% SGST) with no ITC for the developer.
- Rate applies to the entire project if it qualifies as an affordable housing project under the notifications
- Developer cannot claim ITC on materials, works contract services, or any other inputs used in the project
- This rate is applied to the consideration payable for the under-construction unit, after the deemed 1/3 land deduction
3.2 Non-Affordable Residential Housing — 5% Without ITC NN 04/2019-CT(R)
All other under-construction residential units (not meeting affordable housing criteria) are taxed at 5% GST (2.5% CGST + 2.5% SGST) with no ITC for the developer.
3.3 How GST is Calculated — The Land Value Deduction
Under-construction property sales are treated as a composite supply of goods and services. Since land is not subject to GST (Schedule III), the notifications provide a deemed deduction of 1/3 of total consideration towards land value.
Taxable Value = Total Consideration − (1/3 × Total Consideration) = 2/3 of Total Consideration
GST Payable = Taxable Value × Applicable Rate (1% or 5%)
Practical shortcut: Effective GST as a percentage of the total flat value = 1% × 2/3 = 0.67% (affordable) or 5% × 2/3 = 3.33% (non-affordable)
| Property Type | Total Value | Deemed Land (1/3) | Taxable Value (2/3) | GST Rate | GST Payable | Total Cost |
|---|---|---|---|---|---|---|
| Affordable housing (Tier-2 city, 85 sqm, ₹38L) | ₹38,00,000 | ₹12,67,000 | ₹25,33,000 | 1% | ₹25,333 | ₹38,25,333 |
| Standard apartment (Mumbai, ₹70L) | ₹70,00,000 | ₹23,33,000 | ₹46,67,000 | 5% | ₹2,33,350 | ₹72,33,350 |
| Premium flat (₹1.5 crore) | ₹1,50,00,000 | ₹50,00,000 | ₹1,00,00,000 | 5% | ₹5,00,000 | ₹1,55,00,000 |
| Ready-to-move flat (OC received) | Any value | — | — | NIL | ₹0 | Base price only |
3.4 When Exactly Does GST Apply — The Completion Certificate Rule in Practice
The law is clear: GST applies to “supply of construction services” before completion. Once the builder obtains an OC/CC — even for a specific tower/phase — units in that completed phase are not subject to GST.
Large projects are developed in phases. If you buy in Phase 2 (under construction) while Phase 1 has already received OC — Phase 1 units are GST-free but your Phase 2 unit still attracts GST. Verify the OC status for the specific tower/building you’re purchasing in.
Builder delay risk: If a builder promises delivery but gets OC late — and you’ve been paying installments before OC (under-construction payments) — all those payments attracted GST. If OC comes before some payments were made, no GST on those remaining installments.
4. GST on Commercial Under-Construction Properties
Commercial under-construction properties (shops, offices, co-working spaces, warehouses, retail units) follow a different GST framework from residential properties:
| Commercial Property Type | GST Rate | ITC for Developer? |
|---|---|---|
| Under-construction commercial shop / office in a builder project | 12% with ITC (historical rate — verify post-Sept 2025 notification) | ✅ Yes (developer can claim ITC on inputs) |
| Under-construction commercial complex (standalone commercial) | 18% (works contract rate post-Sept 2025) | ✅ Yes (if not a composition scheme) |
| Ready-to-move commercial property (OC received) | NIL — not under construction | N/A |
| Renting of completed commercial property | 18% | ✅ Tenant can claim ITC |
The 56th Council eliminated the 12% GST slab for works contracts. Commercial real estate developer sales (construction services under NN 11/2017-CT(R)) need to be verified against the updated notification for applicable rate post-September 2025. The position as of May 2026 based on available information is that commercial under-construction sales are at the applicable works contract rate under NN 11/2017 — which may be 18% following the slab rationalization, though the specific commercial real estate notification carve-out must be verified. Builders with commercial projects must confirm the current applicable rate with their GST consultant before invoicing post-September 2025.
5. Joint Development Agreements (JDA) — The Most Complex GST Area
A Joint Development Agreement is entered when a landowner gives land to a developer, and the developer constructs a project. The consideration can be:
- Revenue sharing: Developer pays the landowner a portion of sales revenue
- Area sharing: Developer gives the landowner a fixed number/percentage of constructed units
- Combination: Mix of cash + units
5.1 Landowner’s GST Position
The landowner gives Transfer of Development Rights (TDR) — the right to build on the land — to the developer. This is a supply of service by the landowner (not a sale of land, which would be exempt).
| Landowner Activity | GST Treatment |
|---|---|
| Granting TDR / development rights to developer | Supply of service — TAXABLE at 18% But: RCM applies — developer pays the GST, not the landowner NN 13/2017-CT(R) Entry 5C |
| Sale of land itself (not development rights) | NOT TAXABLE — Schedule III |
| Receiving constructed units from developer | Reverse of construction supply — no separate GST on receiving units |
| Selling those received units to end buyers (before OC) | TAXABLE — landowner becomes a “promoter” for those units; 1%/5% applies |
| Selling received units to buyers AFTER OC | NOT TAXABLE — ready-to-move property |
5.2 Developer’s GST Position in JDA
The developer has three separate GST obligations in a JDA:
- Pay RCM on TDR received from landowner (18% on TDR value — see below)
- Charge GST on units sold to end buyers (1%/5% on under-construction units)
- Charge GST on units “sold” to landowner — the units given to the landowner as consideration represent a supply by the developer
5.3 Transfer of Development Rights (TDR) — RCM on Developer NN 13/2017-CT(R) Entry 5C
When a landowner provides TDR (development rights) to a developer:
→ The landowner does NOT collect or pay GST
→ The developer pays 18% GST under RCM on the value of TDR
→ Value of TDR = Proportionate value based on area sold to independent buyers for similar units in the same project
Time of supply for TDR:
→ For the landowner (as supplier): Earliest of (a) date of possession of units to landowner, OR (b) date of completion certificate for those units
→ For the developer (paying RCM): The tax must be paid at time of supply
5.4 Valuation and Time of Supply for TDR — CBIC Circular 55/29/2018
Valuing TDR is complex since there is no monetary payment from developer to landowner (in area-sharing JDA). CBIC Circular 55/29/2018-GST established the methodology:
- TDR value = Market value of similar area at the time of TDR transfer
- Derived from the price at which the developer sells comparable units to independent buyers in the same project
- Proportionate calculation based on the area of land transferred relative to total project area
The developer pays 18% RCM on TDR value. Can the developer claim this as ITC?
- If the project is a residential project under the 1%/5% no-ITC scheme → ITC on TDR RCM is also blocked
- If the project is commercial → ITC on TDR RCM may be available
6. Works Contract in Real Estate — GST for Contractors NN 11/2017-CT(R)
Civil contractors, structural engineers, MEP (mechanical, electrical, plumbing) contractors — all who provide works contract services for construction — charge GST on their services.
Current Rate Structure for Works Contracts (Post 22 September 2025)
| Works Contract Category | Rate (Pre-Sept 2025) | Rate (Post-22 Sept 2025) |
|---|---|---|
| General works contract (commercial/industrial construction) | 18% | 18% — no change |
| Works contract for government infrastructure (earlier at 12%) | 12% | 18% — 12% slab eliminated |
| Works contract for affordable housing by developer | 12% | 18% — 12% slab eliminated |
| Pure labour contract for government housing (EWS/LIG) | Exempt | Exempt — unchanged |
| Works contract for original construction by government/local authority for their own use | 12% | 18% |
| Sub-contractor’s work on any project | 18% always | 18% — unchanged |
A developer building affordable housing (selling to buyers at 1% GST, no ITC) was previously paying 12% GST on works contract from their civil contractor. From 22 September 2025, the contractor charges 18%. The developer: (a) cannot claim ITC on this under the 1%/5% scheme, (b) pays 6% more in contractor GST cost. For a ₹50 crore construction project, this is an additional ₹3 crore GST cost — absorbed entirely by the developer or passed on through higher flat prices.
The 56th Council partially offset this by reducing cement GST from 28% to 18% — a key construction input cost saving.
What Qualifies as “Works Contract” in Construction?
Works contract = contract involving both goods (materials) and services (labour/skill) resulting in construction/installation/fabrication of immovable property. Any contract where:
- Civil construction (RCC, brickwork, plastering, tiling)
- Electrical wiring and fittings (if site-specific installation)
- Plumbing, sanitation, HVAC installation
- Steel fabrication and erection at site
- Painting, polishing (if part of a construction contract)
7. RCM in Construction — The 80% Registered Supplier Rule § 9(4) CGST, NN 07/2019-CT(R)
Real estate developers/promoters must procure at least 80% of their total inputs and input services from registered GST suppliers. If they fall below this threshold, they must pay GST under RCM on the shortfall.
If total procurement value for the project = ₹10 crore
Minimum from registered suppliers = 80% = ₹8 crore
If actual procurement from registered = ₹7 crore
Shortfall = ₹1 crore
RCM payable = 18% on ₹1 crore = ₹18 lakh (paid in cash, no ITC available to developer under the 1%/5% scheme)
Key Exclusions from the 80% Calculation
- Cement purchases — excluded from the 80% calculation (irrespective of supplier registration)
- Capital goods — generally excluded
- Services from government entities (covered under § 9(3) separately)
Developers must maintain detailed procurement registers tracking the registered vs unregistered supplier ratio on each project. Many small contractors (electricians, plumbers, painters) in the construction supply chain are unregistered. Exceeding the 20% unregistered procurement threshold silently creates an RCM liability that developers discover only at year-end reconciliation.
8. ITC in Real Estate — What Builders Can and Cannot Claim
| Developer Type | ITC Status | Notes |
|---|---|---|
| Residential developer under 1% or 5% scheme (no-ITC scheme) | ❌ No ITC on any inputs | All GST on materials, contractor services, RCM, TDR RCM — pure cost |
| Commercial developer (18% GST on sales, ITC scheme) | ✅ ITC available on inputs | Subject to § 17(5)(c)/(d) blockage — civil structure construction ITC still blocked (post Finance Act 2025) |
| Mixed project (residential + commercial) | Pro-rated | ITC available proportionate to commercial area; none for residential. Complex calculation per Rule 42. |
| ITC on TDR RCM (18%) for residential developer | ❌ Blocked | No ITC scheme → TDR RCM is a cost |
| ITC on works contract services for own construction | ❌ Blocked per § 17(5)(c) | Even for commercial developers — works contract for own building is blocked unless sub-contracted further |
Before October 2024, there was hope that commercial real estate developers building properties for renting (malls, office parks) could claim ITC on construction costs citing the Safari Retreats judgment. After the Finance Act 2025 retrospectively changed “plant or machinery” to “plant and machinery” in § 17(5)(d), this avenue is closed — retroactively from 1 July 2017. Mall developers, commercial real estate firms, and hospitality companies that had claimed ITC based on the Safari Retreats interpretation should review their position and make necessary reversals if applicable.
9. Affordable Housing — PMAY, EWS/LIG & GST Exemptions
PMAY (Pradhan Mantri Awas Yojana) — GST Treatment
| PMAY Activity | GST Rate |
|---|---|
| Pure labour contracts for construction of single residential units under PMAY (EWS/LIG) — by any person | EXEMPT NN 12/2017, Entry 10 |
| Works contract (goods + services) for PMAY housing construction | 18% (post-Sept 2025) — not exempt if involves goods |
| Developer selling PMAY-qualifying flat to buyer | 1% (if criteria met) or Exempt for EWS/LIG if fully government-sponsored |
| Beneficiary-Led Construction (BLC) — individual builds own house under PMAY | Materials at applicable rates; pure labour services exempt |
10. Redevelopment Projects and Society Reconstruction
Redevelopment (where an existing housing society gives land to a developer for construction of new, larger buildings) has unique GST treatment:
| Transaction | GST Treatment |
|---|---|
| Society grants development rights to developer | Supply of TDR by society → Developer pays 18% RCM |
| Developer constructs new units and gives existing members like-for-like units | Deemed supply by developer — 1%/5% as applicable on value of those units |
| Developer sells additional units (beyond society members’ share) to new buyers | Normal 1%/5% GST applies |
| Corpus fund paid by developer to society/members for displacement | Part of development cost — no separate GST on corpus fund payment |
| Rental compensation paid to displaced members during construction | Not a supply — compensation payment; no GST |
Sitaram Co-op Housing Society (Mumbai, 50 members) gives their plot to Horizon Developers. Developer builds 50 new flats for existing members + 30 additional flats for sale.
- Society grants TDR → Developer pays RCM: 18% on value of TDR (based on proportionate market value)
- Developer provides 50 flats to members: Deemed supply by developer → GST at 5% on value of those 50 flats (if non-affordable; 1% if affordable). Time of supply = possession or OC, whichever earlier
- Developer sells 30 additional flats: Normal 5%/1% GST charged to new buyers
- Members selling their received flats (before OC): Members become promoters for those units — 5% or 1% GST applies
- Members selling after OC: No GST — ready-to-move
11. GST on Long-Term Lease of Land and Land Sale
| Transaction | GST? | Rate |
|---|---|---|
| Outright sale of land | No | Schedule III Entry 5 — not a supply |
| Long-term lease of land (≥30 years) to developer for construction | Yes — RCM | 18% — developer pays RCM under NN 13/2017 Entry 5B |
| Short-term lease of land (tenancy/licence) | Yes | 18% — forward charge if supplier is registered |
| Long-term lease of industrial plot (e.g., MIDC, GIDC, SIDCO) | Yes — RCM | 18% — RCM on developer/industrial unit |
| Assignment of right to use land by government to developer | Yes — RCM | 18% — government service to business entity under RCM |
12. GST on Ancillary Property Charges
| Charge | GST? | Rate | Notes |
|---|---|---|---|
| Parking space (covered / open) | Yes | 18% (if sold separately) / part of flat price (if combined) | If bundled with flat as single price → 5%/1%. If separate invoice → 18% |
| Club house membership / amenity charges | Yes | 18% | Taxable service; ITC blocked for buyer under § 17(5)(b)(iii) |
| Preferential Location Charges (PLC) | Yes | 5%/1% if part of composite supply with flat; 18% if separate | Usually bundled — same rate as flat applies |
| Advance/booking amount | Yes | Same rate as the flat | Time of supply = date of advance payment |
| Maintenance charges (for maintenance period until society formation) | Yes | 18% | Maintenance = service; taxable at 18%; builder-managed |
| Society maintenance charges (after society formation) | Up to ₹7,500/month per member: Exempt; Above ₹7,500: 18% | — | Society is separate from builder; different GST threshold applies |
| GST on stamp duty / registration | No | N/A | Stamp duty and registration are state charges — not GST |
13. Impact of 56th GST Council Rate Rationalization on Construction
| Item / Service | Pre-22 Sept 2025 | Post-22 Sept 2025 | Net Impact on Construction |
|---|---|---|---|
| Cement (all types) | 28% | 18% | Major saving — 10% reduction on the biggest construction input |
| Steel (TMT bars, structural steel) | 18% | 18% | No change |
| Sand, aggregates, gravel | 5% (royalty-based) | 5% | No change |
| Tiles, marbles, granite | 18%/12% | 5% or 18% (rationalized) | Varies by type — some categories cheaper |
| Paints, varnishes | 18% | 18% | No change |
| Electrical fittings, wiring | 18%/12% | 18% or 5% | Some items cheaper (low-end fittings) |
| Works contract (civil) for builder to government | 12% | 18% | 6% cost increase for builders working on government projects |
| Works contract (civil) — commercial projects | 18% | 18% | No change |
Cement’s GST reduction from 28% to 18% is effectively a 10-percentage-point reduction on a major construction input. For a typical residential building, cement accounts for 15-20% of construction cost. On a ₹50 crore project with ₹8 crore of cement:
Old cost: ₹8 crore + ₹2.24 crore (28% GST) = ₹10.24 crore (no ITC for residential developer)
New cost: ₹8 crore + ₹1.44 crore (18% GST) = ₹9.44 crore
Saving: ₹80 lakh per ₹50 crore project — a cost benefit that competitive builders should pass on to buyers.
14. Compliance for Real Estate Developers — Key Requirements
- GST Registration: Mandatory when aggregate turnover from real estate activity exceeds ₹40 lakh/₹20 lakh; registration at project commencement recommended
- Project-level tracking: Maintain separate procurement registers for each project to track the 80% registered supplier threshold
- GSTR-1 and GSTR-3B: Monthly/quarterly returns; all flat sales reported in GSTR-1
- Self-invoice for TDR RCM: Issue within 30 days of receiving TDR from landowner; pay RCM in cash
- Unsold inventory at project end: GST is payable on the deemed supply of unsold units at the time of OC issuance (if units are still under construction when OC is received)
- e-Invoicing: Applicable if developer’s aggregate turnover exceeds ₹5 crore — must generate IRN-stamped invoices for all flat sales and works contract receipts
- RERA compliance: Separate project account under RERA — GST collected must flow through the appropriate tax account
- ITC transition: Builders who started projects under the old scheme (12%/8% with ITC) and transitioned to the new scheme must reverse ITC per transition rules
15. Common Issues, Disputes & GST Notices in Real Estate
| Issue | Risk | Resolution |
|---|---|---|
| Not paying GST on advance booking amounts | GST demand from date of booking | Time of supply = advance payment date; GST must be paid on advances |
| Treating JDA unit transfer to landowner as non-taxable | Large demand for 1%/5% GST on developer’s deemed supply | Deem supply of construction to landowner at market value; charge GST at time of possession/OC |
| Not paying RCM on TDR in JDA | 18% demand + penalty on TDR value | Calculate TDR value based on proportionate market price; pay RCM on self-invoice within 30 days |
| Incorrectly classifying flat as affordable (to use 1%) | Demand for 4% difference (5% – 1%) on entire project | Verify carpet area AND value both meet criteria; both conditions are conjunctive (AND, not OR) |
| Not reversing ITC when switching from old (12% ITC) to new scheme (5% no ITC) | ITC reversal demand | File ITC-03 at time of scheme change; reverse proportionate ITC |
| Charging 18% GST on society maintenance (≤₹7,500/month) | Excess tax charged; refund claim by members | Maintenance ≤₹7,500/month/member is exempt; correct invoice issuance |
| Not paying GST on unsold units at time of OC | Demand for GST on deemed supply at OC | Calculate and pay GST on fair market value of unsold inventory at time of obtaining OC |
16. Case Studies
Property: 3-BHK under-construction flat in Bengaluru. Carpet area: 95 sqm. Total consideration: ₹80 lakh.
Affordable housing check: Metro city (Bengaluru) → limit is 60 sqm carpet area. Carpet area = 95 sqm → exceeds 60 sqm → NOT affordable housing. Rate = 5%.
| Step | Calculation | Amount |
|---|---|---|
| Total flat value | — | ₹80,00,000 |
| Deemed land deduction (1/3) | ₹80L × 1/3 | ₹26,67,000 |
| Taxable value (2/3) | ₹80L − ₹26.67L | ₹53,33,000 |
| GST @ 5% | 5% × ₹53.33L | ₹2,66,650 |
| Total payable to builder (excluding stamp duty) | ₹80L + ₹2.67L | ₹82,66,650 |
If the same flat had been in a non-metro city (e.g., Nagpur) with carpet area ≤90 sqm at ₹40L value — it would qualify as affordable housing at 1%.
Landowner gives 1-acre plot in Pune to Skyline Developers. Agreement: developer builds 100 flats, gives 20 to landowner, sells 80.
| Transaction | GST |
|---|---|
| Landowner gives TDR to developer | Developer pays 18% RCM on TDR value If market value = ₹5 crore → RCM = ₹90L (cannot be claimed as ITC in residential scheme) |
| Developer builds and gives 20 flats to landowner (deemed supply) | 5% on 2/3 of market value of those 20 flats If 20 flats worth ₹2 crore each = ₹40 crore GST = 5% × ₹26.67 crore = ₹1.33 crore |
| Developer sells 80 flats to public at ₹2 crore each | 5% × ₹1.33 crore per flat = ₹6.67L per flat Total: 80 × ₹6.67L = ₹5.33 crore |
BuildRight Construction was awarded a ₹20 crore civil works contract for an affordable housing project in October 2025.
| Period | Rate | Tax on ₹20 crore |
|---|---|---|
| Before 22 Sept 2025 (old rate) | 12% | ₹2.40 crore |
| After 22 Sept 2025 (new rate) | 18% | ₹3.60 crore |
| Additional GST burden on developer | ₹1.20 crore extra — which developer cannot claim as ITC (under 1%/5% scheme) | |
Developer must re-examine project viability or renegotiate flat prices. The cement GST reduction (28%→18%) partially offsets this but typically not 1:1 since works contract labour forms a larger share.
17. Frequently Asked Questions
GST Advisory for Real Estate Developers, Contractors & Homebuyers
Real estate GST is one of the most complex areas with JDA taxation, TDR RCM, works contract rate changes, Safari Retreats implications, and the 80% procurement rule. GCA provides end-to-end GST advisory for developers, compliance for contractors, and guidance for homebuyers — ensuring you pay exactly what’s due, nothing more. Pan-India, 100% digital.
📞 +91-9911369185 · ✉️ [email protected]
Disclaimer: Educational purposes only. Based on CGST Act 2017, related notifications, and circulars up to May 2026. Real estate GST rates are subject to frequent revision — verify current notifications before any transaction. Consult a qualified professional for specific advice. Commercial property rates post-September 2025 should be specifically verified with current CBIC notifications.
Key References: CGST Act 2017 § 9(3), § 9(4), § 17(5), Schedule II Entry 5, Schedule III Entry 5 · NN 03/2019-CT(R) (1% affordable housing) · NN 04/2019-CT(R) (5% non-affordable) · NN 11/2017-CT(R) (works contract rates) · NN 12/2017-CT(R) (PMAY labour exempt) · NN 13/2017-CT(R) Entry 5B/5C (TDR and land lease RCM) · NN 07/2019-CT(R) (§ 9(4) real estate RCM) · Finance Act 2025 § 119 (§ 17(5)(d) retrospective amendment) · CBIC Circular 55/29/2018-GST (JDA/TDR valuation) · 56th GST Council (Sept 2025) rate rationalization · Supreme Court: Safari Retreats (Oct 2024); Review dismissed (May 2025)